Observe
Map relevant BMS points, assess data quality and understand how the cooling system operates—without changing controls.
EnthalpyX integrates with existing building management and cooling-control infrastructure. Deployment begins by understanding the plant, its available data and the boundaries of the intended optimisation scope.
Each stage is considered on its own merits. Progression depends on the system, data quality, safeguards and the site's agreement.
Map relevant BMS points, assess data quality and understand how the cooling system operates—without changing controls.
Identify potential improvements for the engineering team to assess against site requirements before any intervention.
Where explicitly enabled, apply bounded supervisory optimisation to agreed points within defined limits and safeguards.
EnthalpyX does not require unrestricted control of the plant. Any supervisory scope is agreed in advance and can be restricted or paused.
Energy performance is assessed against an agreed reference using observed building data—not solely the optimiser's predicted result.
The assessment accounts for relevant operating conditions, comfort requirements and material changes that may affect the comparison.
Start with your cooling-system architecture and existing BMS. No control access or equipment changes are needed for an initial conversation.